Name of assignment/project:

Basic Infrastructure Development of “Bangladesh Institute of Frontier Technology (BIFT)” Project

Year:

December 2024 to March 2025

Location:

Madaripur

Client:

Ministry of Posts, Telecommunication and Information Technology, Bangladesh Hi-Tech Park Authority, Funded by the Government of Bangladesh

Positions held:
Jr. Design Engineer

Main project features:

Design an internal canal by evaluating water level analysis from the two nearest water level stations near the project area.

Activities performed:

  • Collected BWDB water level data and analyzed project area water levels via interpolation from two BWDB stations.
  • Reviewed project features and master plans to design a 600-meter internal canal for drainage and beautification.
  • Conducted field visits to verify site conditions.
  • Prepared designs and drawings for the 600-meter canal as part of the BIFT project master plan.