Activities performed: | - Conducted project site visits for Preliminary Concept Reports (PCR) and Feasibility Study Reports.
- Prepared Detailed Design Reports for hydraulic structures such as culverts, regulators, and canals.
- Verified survey reports (benchmark back-sight checks and closed surveys) and checked third-party topographic surveys to prepare land-use maps via AutoCAD.
- Analyzed hydraulic data, including drainage analysis and water level interpolation/extrapolation.
- Collected LGED secondary water level data and analyzed 50-year return periods using Gumbel, Normal, and Log Pearson methods.
- Analyzed LGED rainfall data to determine 3-day drainage rates for agricultural development.
- Conducted field assessments to prepare Environmental, Social, and Agricultural Assessment Reports, and coordinated with specialists regarding EIRR and FIRR.
|