Name of assignment/project:

Irrigation Management Improvement Project (IMIP), Project Management & Design Consultant (PMDC), Mott MacDonald Ltd (UK) in association with Euroconsult Mott MacDonald (Netherlands), Northwest Hydraulic Consultants (Canada), SODEV Consultant Ltd (Bangladesh), Under Bangladesh Water Development Board funded by ADB. Ganges Kobodok Irrigation Project area, Teesta Barrage Project area (Phase-1) and Muhuri Irrigation Project Area. Bangladesh.

Year:

May 2015 to September 2016

Location:

Bangladesh

Client:

Bangladesh Water Development Board funded by ADB.

Positions held:
Junior Design Engineer

Main project features:

Design & Drawings of Hydraulic Structures & Land use Digitization for Buried Pipe Network of Muhuri Irrigation Project (MIP). 

Activities performed:

  • Conducted field assessments of primary, secondary, and tertiary canal systems in the Teesta Barrage, Muhuri Irrigation, and Ganges Kobodok project zones.
  • Collected water level, rainfall, and contour data from government departments and assisted the senior hydrologist with data analysis.
  • Prepared designs for hydraulic structures (water control structures, regulators, balancing storage reservoirs, intake channels) and surface irrigation canal systems.
  • Reviewed and standardized AutoCAD drawings and verified estimates and BOQs for new and rehabilitated structures.
  • Collected and processed spatial data and satellite imagery using ArcGIS for project mapping and land-use feature digitization.
  • Exported images and maps in various resolutions and formats for specific project uses.
  • Assisted in monitoring civil works quality control and preparing field monitoring reports.